Faina Realty
Two residential towers rising over green at dusk
Impact

A good redevelopmentbrings a neighbourhoodhome, stronger.

We measure our work by the families who move back into it: every household returned to a better home, in a building made to last well beyond the sale.
By the numbers
Families served

Households handed the keys to a completed home across the nine delivered projects.

670
Delivered with an Occupation Certificate

All nine completed buildings received their Occupation Certificate before possession.

100%
People employed

Across real estate, logistics, agriculture, chemicals and infrastructure.

370+
Sq ft delivered

Residential and commercial, across four decades in Mumbai.

360,000
Mumbai from above, low-rise neighbourhoods below the towers
01

Redevelopment without displacement

A redevelopment done well brings every household home to a better building. It rests on two things: transit rent that arrives on time, and a building delivered as promised.
  • Transit rent paid monthly, in advance, for the full construction period
  • Transit accommodation sourced within one kilometre wherever the market allows
  • Member agreements drafted before design freeze, not after
  • Rehab carpet area guaranteed in writing and verified at handover
Tower cranes over a site at dusk
02

Building to outlast the sale

Specification is where a developer's real position shows. Ours is set by the people who will still be answering the phone in fifteen years.
  • Structural design to seismic zone III with an independent third-party check
  • Waterproofing and services specified above code, not to it
  • Construction chemicals supplied by the group's own manufacturing arm
  • Structural warranty backed in writing by the engineers who signed the drawings
Residential towers set among green hills
03

Water, waste and the ground plane

Mumbai buildings sit on a water table and a drainage system that cannot take much more. Ours are built to take less out and put less back.
  • Sewage treatment with full recycling for flushing and landscape
  • Rainwater harvesting on every project since 2016
  • Parking on podium so the ground plane stays planted
  • Construction debris segregated and routed to authorised recyclers
A site crew in hard hats and high-visibility vests
04

The people who build it

The site workforce is the part of this industry that gets counted last. We count it first.
  • On-site accommodation with running water and power on every project
  • Wages paid fortnightly, directly, never through a labour contractor's float
  • Schooling costs covered for workers' children on long-running sites
  • Full safety equipment issued and enforced, including on subcontracted work
In their words
The work was on time with perfection. Their team was outstanding and served us with utmost respect. What was on the paper was delivered as it is.
Altaf Adam SharifInvestor, Qatar
Next
Ask us for the record. Every building, every handover, every Occupation Certificate.